HAMS Garments Ltd. has received the World Championship for Energy Savings (WCES) Certificate after achieving a 78.1% reduction in CO₂ emissions at its apparel manufacturing facility in Bangladesh. The recognition places the company among the leading contenders for the 2026 WCES Award.
The project focused on an existing plant rather than new construction. The facility covers 203,030 sq ft (18,861.95 m²) and has about 3,216 regular occupants. Its continuous production, lighting, ventilation, cooling, compressed air, pumps and motors create substantial energy demand, making operational improvements central to the decarbonisation effort.
Efficiency package
HAMS used ASHRAE Level 1 and Level 2 energy audits to identify and prioritise investments. The measures included upgrading and optimising energy-consuming equipment, improving lighting efficiency, reducing unnecessary electrical loads, optimising motors and pumps, and improving ventilation and cooling performance. Stronger energy metering and sub-metering gave the team greater visibility into consumption and helped target corrective action.
A 550 kW on-site solar photovoltaic system was a major investment, reducing reliance on grid electricity and fossil-fuel-based energy. Renewable energy now supplies about 47.36% of the project's energy use. Together with efficiency measures, the project reports an overall energy saving of 75.25%.
The effectiveness of the approach is linked to the building's LEED v4 Existing Buildings: Operations & Maintenance Platinum certification, with 108 out of 110 points. The project reports the certification as independent demonstration of the facility's performance.
Monitoring and demand management
Physical upgrades are supported by an energy-management and operational optimisation system. HAMS monitors performance through metering, equipment trend reviews and building-management practices, allowing staff to detect abnormal consumption and inefficiencies. Ongoing commissioning, preventive-maintenance planning, equipment performance monitoring and defined operational responsibilities are part of the programme. Energy use is reviewed periodically against expected performance so that corrective action can be taken.
The facility also operates a demand response programme, including a 10% demand-reduction drill, to show its ability to manage electrical demand when the grid is under stress. Operating schedules and equipment use are reviewed to minimise unnecessary loads while maintaining manufacturing requirements.
Staff engagement
HAMS integrates training, operational guidelines and employee engagement into its energy-management programme. Facility and maintenance personnel receive training on efficient operation, preventive maintenance, energy monitoring and corrective actions. Procedures encourage equipment to run only when needed, unnecessary loads to be switched off, and energy-intensive activities to be managed without compromising production, safety or occupant comfort. Structured action plans, assigned responsibilities and periodic performance reviews support accountability.
The company presents the project as a replicable model for the apparel sector. Its results indicate that substantial energy savings can come not only from capital investment but also from better operation, informed users and continuous performance management. For existing garment factories, the combination of audits, metering, renewable energy, maintenance and staff involvement offers a practical route to lower emissions while production continues.